Haulout Rates
(includes basic pressure wash, set-up and launch
|
|
Up to 40'
41' to 50'
51' to 60'
61' to 70'
71' + |
|
$10
$11
$12
$14
$18 |
per ft
per ft
per ft
per ft
per ft |
| There will be an additional hourly labor charge plus waste disposal fee ($50 per bag) for excess marine growth on bottoms |
|
|
|
|
|
|
|
| Associated Rates |
| Double straps |
$100 |
|
Travelift rate beyond
haul and launch |
$300 |
per hour, 1/2 hr minimum |
| Crane rate |
$250 |
per hour, 1/2 hr minimum (2 person crew) |
| Forklift
rate |
$150 |
per hour,
1/4 hour minimum |
| Reposition
boat using Travelift |
|
Half of the listed haulout rate |
|
|
|
|
|
|
|
| Labor
Rates |
| Reposition
boat stands |
$1 |
per foot
|
Sandblasting &
Beadblasting |
$150 |
per hour,
1 hr min. in shed (outside of shed will be quoted) |
| Mechanical |
$105 |
per hour, 1/2 hour min. |
| Welding |
$100 |
per hour,
1/2 hr minimum - does not include fire watch
(if applicable) at $82/hr. |
| Welding at dock |
$110 |
per hour, 1 hr min. - does not include fire watch
(if applicable) at $82/hr. |
| General Labor Rate * |
$100 |
per hour,
1/2 hr minimum |
| *General labor includes Mechanical, Fiberglass, Carpentry and Rigging Work. |
|
|
|
|
|
|
|
| Bottom
Painting Services |
|
|
|
|
| Package Prices - View ROLLED package pricing. Call for pricing for a sprayed-on racing bottom. |
| Extra Bottom
prep/paint (rolled bottoms) |
$82 |
per
hour, 1/2 hr minimum |
Additional coat -
Rolled |
$8 |
per foot, plus materials
|
Additional waterline coat-
Rolled (24") |
$3 |
per foot,
plus materials
|
|
|
|
|
|
|
|
| Buff
& Wax Topsides |
|
|
|
|
Up to 40'
41' and over |
$15
$82 |
per foot, plus materials
per hour, plus materials |
|
|
|
|
|
|
|
| Lay Days (haul day &
launch day are billed at 1 day total) |
| If you are having Bay Marine perform work on your boat then a grace period for storage may apply. |
| Yard |
DOW |
$2.00 |
per foot per day |
| Dock/Water |
DOW |
$1.00 |
per foot per day |
| Mast on cart |
$20.00 |
per day |
| Mast on the rack |
$6.00 |
per day |
| |
|
Please ask for estimates on topsides painting,
major mechanical repairs and upgrading hardware.
Machine shop, propeller service and naval architecture
service also available.
Prices effective July 15, 2010
Prices subject to change without notice. |